Net Metering in Delhi – Rules, Benefits & Complete Process (2026)Introduction: Why Net Metering is a Game-Changer in Delhi

If you’re planning to install solar panels in Delhi, understanding net metering is essential. It’s the key reason why solar becomes not just eco-friendly—but financially smart.
With rising electricity costs and strong government support, net metering allows you to earn back from the grid when your solar system generates extra electricity.
In this guide, you’ll learn:
What net metering is
Latest rules in Delhi
Key benefits
Step-by-step application process
What is Net Metering?
Net metering is a billing mechanism that allows you to export excess solar electricity to the grid and get credits on your electricity bill.
Simple Example:
Your solar system produces: 10 units
Your home consumes: 7 units
Extra 3 units → sent to the grid
You get credits for those 3 units
At the end of the billing cycle, you only pay for the net units consumed.
Net Metering Rules in Delhi (Latest Updates)
Delhi has one of the most solar-friendly policies in India under the Delhi Solar Energy Policy.
Key Rules:
1. Eligibility
Available for residential, commercial & industrial users
Must have a grid-connected solar system
2. System Capacity
Up to sanctioned load is allowed
Typically ranges from 1 kW to 500 kW
3. DISCOM Approval Required
You must apply through your local DISCOM:
BSES Rajdhani Power Limited
BSES Yamuna Power Limited
Tata Power Delhi Distribution Limited
4. Bi-Directional Meter
A special net meter is installed
It records both:
Import (grid to home)
Export (solar to grid)
5. Billing Cycle
Units are adjusted monthly
Surplus may be settled annually (as per policy)
Benefits of Net Metering in Delhi
1. Massive Electricity Bill Savings
You only pay for net consumption, reducing bills by 70–90%.
2. Faster ROI on Solar
With net metering, your solar system cost can recover in 3–5 years.
3. Earn from Excess Power
Unused electricity is not wasted—you send it to the grid and get credits.
4. Environment-Friendly
Reduces dependency on fossil fuels and lowers your carbon footprint.
5. Increases Property Value
Homes with solar + net metering are more attractive to buyers.
Step-by-Step Process to Apply for Net Metering in Delhi
Here’s the exact process followed in Delhi:
Step 1: Install Solar System
Choose a reliable installer like SOLARMAIT to ensure:
Proper design
Compliance with DISCOM norms
Step 2: Submit Application
Apply online via your DISCOM portal with:
ID proof
Electricity bill
System details
Step 3: Technical Feasibility Approval
DISCOM checks:
Grid compatibility
Load capacity
Step 4: System Installation & Inspection
After approval:
Install the solar system
DISCOM inspects the setup
Step 5: Net Meter Installation
Old meter replaced with bi-directional meter
Step 6: Activation
System gets connected to grid
Net metering starts officially
Important Documents Required
Latest electricity bill
ID proof (Aadhar/PAN)
Property ownership proof
Solar system details (capacity, inverter specs)
Common Mistakes to Avoid
Installing solar without DISCOM approval
Choosing non-certified installers
Incorrect system sizing
Delays in documentation
Why Choose SOLARMAIT for Net Metering in Delhi?
At SOLARMAIT, we handle everything:
You don’t need to deal with complex government procedures—we manage it end-to-end.
FAQs – Net Metering in Delhi
Q1. Is net metering allowed in Delhi in 2026?
Yes, Delhi fully supports net metering under its solar policy.
Q2. How much can I save with net metering?
You can save up to 70–90% on electricity bills.
Q3. How long does approval take?
Typically 2–4 weeks, depending on DISCOM.
Q4. Can I install solar without net metering?
Yes, but you won’t get benefits for excess electricity.
Q5. Is subsidy available with net metering?
Yes, residential users can avail central subsidies along with net metering.
Final Thoughts
Net metering in Delhi is one of the biggest advantages for anyone planning to go solar. It transforms your rooftop into a money-saving asset.
If you’re serious about reducing electricity bills and getting faster returns, net metering is not optional—it’s essential.
